Lifting the Old Hall Floor

Lifting the Old Hall Floor

Mon 12-Oct-2015 by Martin Bond

a-team-afternoon-1

By lunchtime on Monday 12 October, 2015 after the hall had been cleared community volunteers started the on lifting the flooring in the main hall and store room, and removing the stage.

Many thanks to (left to right):

  • Bob Illman
  • Alistair McArthur
  • Philip Brown
  • Martin Bond
  • Brian Edwards
  • Jonny Harford
  • Ron Moore
  • Steve Baber (behind the camera)
  • Campie Hurst-Bannister (tea and choclate cake)
27-dscf1940

sam_1049
The first boards were lifted at the south end of the hall. Although a board was lifted by the stage at the same time the team agreed that working from one end of the hall would be more sensible and safer.

no images were found

The team started lifting boards at the south end of the hall. The boards were nailed down and typically the nails stayed in the supporting joists and the boards pulled off the nails. Many boards split or broke as they were lifted and the ones in the south west corner showed extensive signs of rot where the boards abutted the walls.

33-dscf1946
As the boards are to be retained and sold on any nails left in the boards were removed before they went into storage in Campie and Barnabus’ barn.

no images were found

Meanwhile a small crew started in the store room and removed the shelving from the north wall where the heating boiler and underfloor distribution manifold will be positioned. The floor boards in the store room were lifted ready for the builders to lay in the heating pipework. The floor boards were kept in the room and will be relaid once the heating has been comissioned.

no images were found

An hour and a half into the work and the discussion over a tea break decides progress is slow but steady.

sam_1091
After the tea break and with work finished in the store room, the progress in the main hall picked up as the volunteers worked out the best techniques for lifting boards.

sam_1099
There was some concern that packing under the stage may have been asbestos sheeting so a portable water sprayer was used to damp down any dust.

sam_1106
Over a second tea break with chocolate cake the team decided they could finish the floor boards within a couple of hours and decided to keep working to clear the hall that day. They would leave the joists and stub walls for the next day. Work had started around 1:00PM and finished about 6:30PM.

sam_1108

Photographs of the work

View Slideshow
27-dscf1940 Gloves, googles, dust masks and other safety kit
28-dscf1941 Slow going as the team work out a technique
33-dscf1946 Removing nails from boards ready for reuse
37-dscf1950 Starting on the stage

47-dscf1960 Photography by Steve and Martin
48-dscf1961 The stage was easier than the main floor
53-dscf1966 Dodgy state of joists near the stage
55-dscf1968 Nearly at the stage, defintly over half way

a-team-afternoon-1 The wrecking crew
men-at-work-1 Slow initial progress
men-at-work-4 The very last boards are lifted
men-at-work-5 As the floor inside disappears, nail removal moves outside

sam_1049 First board removed at south wall
sam_1053 First board removed by stage
sam_1057 Shelves and floorboards cleared from store room
sam_1061 First tea break

1 2 ►

 

 

  1. Community Diary

    • Worlington Church Fete 2025 Sat 02-Aug-2025
      Worlington Church Fete 2025 at East Worlington House on Saturday ...
    • Devon Air Ambulance – Thank You 2025 Fri 18-Jul-2025
      Dear Campie and All at Riverside Rocks, Thank you for your ...
  2. More diary entries…

 

  1. Parish Hall Newsletters

    • VE80 Anniversary Exhibition Fri 09-May-2025
      The VE80 Exhibition in the Parish Hall was put together ...
    • Crocus and Cream Teas 2025 Sun 23-Mar-2025
      The annual crocus and cream tea event for Sunday 23rd ...
  2. More newsletters..

 

  1. History Blog

    • VE80 Anniversary Exhibition Fri 09-May-2025
      The VE80 Exhibition in the Parish Hall was put together ...
    • Heritage Project Group Photo Call Fri 20-Feb-2015
      Early (well 9:30 which isn’t that early really) on a ...
  2. More blog posts…

 

  1. Heritage Diary

    • Parish Hall Improvement – Internet Connectivity Sun 02-Jan-2022
      While retaining its heritage value and historic charm the facilities ...
    • Online Timeline Sun 26-Jul-2020
      One activity undertaken as part of the Heritage Projects (2015-2017) ...
  2. More heritage entries…

Copyright © 2025 · East Worlington Parish Hall · Registered Charity 267969 · Log in